23 May 2013

Moving in on 24th May!

Date has been confirmed.

There are still a couple of rectification work need to be done.

1) Feature Wall @ Living Room. (Gavin will replace a new one for me)
2) Water heater tank haven't connect to electrical source
3) Aluminium door with glass panel at Kitchen sink above.
4) Ventilation hole to be replastered.
5) To re-do silicone on kitchen sink and stove.



No comments:

Post a Comment