Its been sometime i updated my blog.
Was so pressured with all the renovation going on and Gavin informing me last minute this and that which i pretty frustrated with his planning. With so little time left during the weekdays after work. I can either take leave or deal all this renovation shit on weekends, leaving with no time for myself.
Since my little princess is coming out in July, i cannot waste my leave for all these and i hoping Gavin can complete everything by late May. If not, first week of June.
Alright, i will let some pictures do the talking then.
1) MBR Toilet Shower Kerb. Couple of reasons why i do shower kerb only.
- Toilet too bloody small
- Placing a shower screen makes the toilet even smaller.
- Sliding/swing door also make the whole toilet cluttered and squeezy.
- Many ppl opt for bi-fold door to reduce the footprint when opening the door. But we purchase the doors from HDB. Why waste?!
- No water gets out of the kerb. *hopefully*
- Installing of rain shower, so i need the door to swing max of 90deg and not more than 100deg to prevent hitting the head.
- Poor design of MBR toilet. Shower point of the right which i felt on the left will be better.
- Last but not least, i don't need to clean the shower screen every week. I just need to wash the floor. =X
2) Box up for wardrobe BR2, MBR & Kitchen. As we are staying the highest, in order the cut down on renovation cost. we didn't do full height wardrobe/cabinet, so we end up like this below.
3) Next, covering up the trunkings.
4) Kitchen base, was very angry when i saw this. Gavin so calculative meh? Such a small gap not willing to do all the way? Call him and ask him why there is gap. He mentioned that your cabinet door need to have allowance in order to swing out.
After hearing that was quite okie. But i told him, if i look below, can i see a hole or not? coz i don't want bugs to go inside or i need to use cotton buds to clean that small tiny little hole. So when he told me his guys do wrong, i go okie. if wrong, act on it.
Next day he told me the gap will be covering up.
Whatever it is, i hope the kitchen will look ok when i go for spotcheck tomorrow.
5) Washing Machine Base. The base was very well done for my expectation. But looking at the measurement, seems that i'm going to face some problem in terms of having a base of 600mm washing machine. Which my Panasonic front load gonna be protruding out. Haiz. I guess no choice la. Live with it, if not, i need to shift my water point & my 13a switch, which gonna cost money AGAIN! -.-
6) Last look at the kitchen. The wiring will be using LED lighting under the top cabinet. So that it will shine down if let say i don't want to turn on kitchen light.